COMMERCIAL WAREHOUSE DILAPIDATION – LUTON

Surveyor – Brown and lee Chartered Surveyors

Value – £59,433

Windmill trading estate is home to over 20 commercial premises, and Unit 9 was JDL Construction’s second project on the estate in 2017.

The 204m2 warehouse received the following works ahead of its new tenant

  • Installation of full scaffold handrail around the roof, and safety netting underneath.
  • New rooflights and roof repairs, and Giromax Delcote applied to the front and rear gutters.
  • Full strip out of all services, including a 178m2 mezzanine floor.
  • Full refurbishment of male/female and disabled WC.
  • Full decoration of all items.
  • 2 part epoxy resin floor.
  • New car park markings.

MD Jamie Logan was thrilled with the outcome, and had this to say “With an extremely short lead time, and a target date to meet for the prospective client, we were always up against it. Both management teams and site teams excelled, overcoming every issue thrown at them to have this project completed 2 days early. We look forward to the next project for Three Rivers”

HPFT – NEW ROAD, WARE

Published 16/06/2017

Client – Hertfordshire Partnership University NHS Foundation Trust

Surveyor – Brown and Lee Chartered Surveyors

Value – £49,553.00

JDL were named principle contractor on this challenging refurbishment. The building was a 1900’s end of terraced house, converted into a new meeting facility for our client.

Our scope of works included –

  • Full strip out of the building.
  • New heating and electrical installations
  • New emergency lighting
  • Waterproofing and plastered throughout
  • Kitchen facilities
  • Floor coverings
  • Decorations

We are pleased to say the project was completed to a high quality, with the facility now open and ready for business.

DILAPIDATION – LUTON

Published 16/06/2017

Client – Three Rivers Property

Surveyor – Brown and Lee Chartered Surveyors

Value – £49,016

The dilapidation of the 300m2 warehouse has been carried out by Stevenage based contractor JDL Construction Limited.

After a full strip out of the existing offices and mezzanine floor, the scope of works included

  • Installation of a full scaffold and Mansafe system around the perimeter of the roof
  • Full safety net to the underside of the roof
  • New roof lights and roof repairs
  • New toilet block with disabled toilet facility
  • New timber windows and aluminium front door
  • Decoration of steel frames, as well as internal and external cladding and shutter door
  • 2 part epoxy resin floor paint
  • New car park coverings and markings

An excellent project that rum smoothly was a credit to the team. This unit is now available to rent, with the incoming tenant being able to enjoy a fresh new unit.

A before and after picture is below –

BAMA COMPLETION

Published 06/03/2017

Client – British Aerosol Manufacturers Association

JDL have successfully completed the full office refurbishment to the headquarters of the British Aerosol Manufacturers Association, based in Stevenage,

The works included

  • Full strip out of the two-floor building
  • New Partitions
  • Glazed Partitions
  • Ceilings
  • M+E
  • Decorations
  • Floor Coverings
  • Kitchen.

The project ran smoothly, on time and budget.

Please see some of the finished pictures below.

PROJECT COMPLETION – GARAGE CONVERSION

Published 24/12/2015

JDL have completed a full garage renovation in Great Ashby, Stevenage.

This project, although fairly small in size, was very challenging due to the amount of work needed to be completed in a short amount of time. From start to finish, we managed to strip out, lay a new insulated floor, re-wire including 13 new LED spot lights, plaster, decorate and fit a complete bathroom suite in 3 weeks.

This project was also logistically challenging due to the location of the house, but was completed on time and on budget, leaving the family to enjoy their Christmas with a new en-suite bedroom.

Client Mr Sutriepka said ” Jamie and his team were fantastic from start to finish. I required additional works to be completed at various stages of the project, and as well as his own ideas, these were completed with minimal fuss. the guys were on site every day, and finished early Christmas eve as planned. overall, the guys were a delight to have at my property, and will be recommending them to anyone who needs any form of building work completed.”

MD Jamie Logan quoted ” this project was great to be part of. the short timescale was challenging, especially to include drying times before we could decorate, but all came together and handed over on time. This project in particular show great testament to the fantastic team that I have, and the credit should be shared with them.

Photographs of this project can be viewed here.

COMMERCIAL WAREHOUSE DILAPIDATION – LUTON

Surveyor – Brown and lee Chartered Surveyors

Value – £59,433

Windmill trading estate is home to over 20 commercial premises, and Unit 9 was JDL Construction’s second project on the estate in 2017.

The 204m2 warehouse received the following works ahead of its new tenant

  • Installation of full scaffold handrail around the roof, and safety netting underneath.
  • New rooflights and roof repairs, and Giromax Delcote applied to the front and rear gutters.
  • Full strip out of all services, including a 178m2 mezzanine floor.
  • Full refurbishment of male/female and disabled WC.
  • Full decoration of all items.
  • 2 part epoxy resin floor.
  • New car park markings.

MD Jamie Logan was thrilled with the outcome, and had this to say “With an extremely short lead time, and a target date to meet for the prospective client, we were always up against it. Both management teams and site teams excelled, overcoming every issue thrown at them to have this project completed 2 days early. We look forward to the next project for Three Rivers”

HPFT – NEW ROAD, WARE

Published 16/06/2017

Client – Hertfordshire Partnership University NHS Foundation Trust

Surveyor – Brown and Lee Chartered Surveyors

Value – £49,553.00

JDL were named principle contractor on this challenging refurbishment. The building was a 1900’s end of terraced house, converted into a new meeting facility for our client.

Our scope of works included –

  • Full strip out of the building.
  • New heating and electrical installations
  • New emergency lighting
  • Waterproofing and plastered throughout
  • Kitchen facilities
  • Floor coverings
  • Decorations

We are pleased to say the project was completed to a high quality, with the facility now open and ready for business.

DILAPIDATION – LUTON

Published 16/06/2017

Client – Three Rivers Property

Surveyor – Brown and Lee Chartered Surveyors

Value – £49,016

The dilapidation of the 300m2 warehouse has been carried out by Stevenage based contractor JDL Construction Limited.

After a full strip out of the existing offices and mezzanine floor, the scope of works included

  • Installation of a full scaffold and Mansafe system around the perimeter of the roof
  • Full safety net to the underside of the roof
  • New roof lights and roof repairs
  • New toilet block with disabled toilet facility
  • New timber windows and aluminium front door
  • Decoration of steel frames, as well as internal and external cladding and shutter door
  • 2 part epoxy resin floor paint
  • New car park coverings and markings

An excellent project that rum smoothly was a credit to the team. This unit is now available to rent, with the incoming tenant being able to enjoy a fresh new unit.

A before and after picture is below –

BAMA COMPLETION

Published 06/03/2017

Client – British Aerosol Manufacturers Association

JDL have successfully completed the full office refurbishment to the headquarters of the British Aerosol Manufacturers Association, based in Stevenage,

The works included

  • Full strip out of the two-floor building
  • New Partitions
  • Glazed Partitions
  • Ceilings
  • M+E
  • Decorations
  • Floor Coverings
  • Kitchen.

The project ran smoothly, on time and budget.

Please see some of the finished pictures below.

PROJECT COMPLETION – GARAGE CONVERSION

Published 24/12/2015

JDL have completed a full garage renovation in Great Ashby, Stevenage.

This project, although fairly small in size, was very challenging due to the amount of work needed to be completed in a short amount of time. From start to finish, we managed to strip out, lay a new insulated floor, re-wire including 13 new LED spot lights, plaster, decorate and fit a complete bathroom suite in 3 weeks.

This project was also logistically challenging due to the location of the house, but was completed on time and on budget, leaving the family to enjoy their Christmas with a new en-suite bedroom.

Client Mr Sutriepka said ” Jamie and his team were fantastic from start to finish. I required additional works to be completed at various stages of the project, and as well as his own ideas, these were completed with minimal fuss. the guys were on site every day, and finished early Christmas eve as planned. overall, the guys were a delight to have at my property, and will be recommending them to anyone who needs any form of building work completed.”

MD Jamie Logan quoted ” this project was great to be part of. the short timescale was challenging, especially to include drying times before we could decorate, but all came together and handed over on time. This project in particular show great testament to the fantastic team that I have, and the credit should be shared with them.

Photographs of this project can be viewed here.